Service

Best Office Relocation

Office moving with an agreed asset list, access schedule and responsibility for each stage.

Searching for “office shifting service near me”? Share the office locality, equipment inventory and permitted access hours at both buildings. For corporate relocation, agree workstation labels and collection timing, and coordinate IT disconnection and reconnection with your own team.

  • Our own moving crews
  • Written moving scope
Shiftify office mover with a carton trolley beside protected desks and monitors

Why move with Shiftify?

  • ISO 9001:2015Certified company
  • 24+ yearsOf legacy
  • 1 lakh+Moves completed
  • 100% Damage Free ShiftingOur shifting commitment
  • Professional TeamOur own moving crews
  • Fast DeliveryCoordinated pickup and delivery

MATCH THE SERVICE TO THE MOVE

Start with the work you need.

Use the service scope to prepare your enquiry. The final arrangement depends on your belongings and both addresses.

A CLEAR PLAN, STEP BY STEP

From the first details to handover.

Know what to share, what to review and what to prepare.

  1. Share the requirements

    Send both addresses, your inventory and preferred date. Include access details and items needing special care.

  2. Review a written quote

    Compare packing, handling, transport, optional work, taxes and payment terms against the same requirements.

  3. Prepare for collection

    Confirm the available date, building permissions and receiving contact. Keep essentials and important documents with you.

  4. Check the handover

    Check the inventory with the crew, note visible concerns and keep the agreed handover and contact details.

CARE STARTS WITH PREPARATION

A plan for each kind of belonging.

Discuss these details with the team so the packing and handling match the items being moved.

Movers covering an armchair with protective blankets for furniture packing

Furniture and large items

Check doorways, stairs and lift openings. Agree any dismantling, labelled fittings and reassembly.

Fragile belongings

Identify glassware, artwork and delicate pieces separately. Discuss the packing method before it is included in the scope.

Equipment and records

Label assets by team and destination. Plan secure handling of records and arrange equipment disconnection with the responsible person.

Inventory and essentials

Number cartons by room. Keep medicines, valuables, documents and first-day essentials accessible to you.

An office relocation plan that follows your business

Understand the choices, prepare a useful enquiry and review the written scope for office relocation. Confirm availability for your locations, inventory and dates with Shiftify before booking.

Define what must work on reopening day

An office relocation needs two linked plans: moving physical assets and making the business ready to operate. Assign an owner to each before fixing the sequence.

List workstations, seating, storage, equipment, records and shared spaces by team. Give every item a destination code that matches the receiving floor plan. Decide which assets can move early and which must remain available until the last working session. Use this priority list to discuss one move or separate phases.

The facilities contact, IT lead and business owner should agree the handoffs. Packing a computer does not complete a backup or reconnect a network. Identify technical work, confidential records, specialist equipment and disposal separately so there is a named responsible person for each task.

For a corporate relocation, distinguish the office asset move from employees’ personal house moves. Give each a separate inventory, receiving contact and approval route. If the company pays for an employee move, agree what it authorises and how any personally requested extras will be handled before booking.

For example, a label such as “Accounts / Floor 2 / Desk 14” can connect a monitor, sealed accessories box and chair to one receiving position. Use that same code on the inventory and floor plan. This is a planning example: replace it with your departments and destinations so the crew can place assets without opening every box.

What to discuss for office relocation

Shiftify uses its own moving crews for the agreed relocation work. Use these points to define the service you need. The accepted tasks, materials and responsibilities should be reflected in your written quotation.

Service planning priorities
PriorityDetails to agree
An asset list and destination mapGroup furniture and equipment by team, room or workstation. Use a destination label that stays with each item and keep the receiving floor plan available so delivery does not depend on one person remembering every desk.
Phases that reflect your workIdentify critical equipment and teams before selecting a date. Discuss a phased move if the business cannot close at once. Evening or weekend work is subject to building, crew and vehicle availability.
Building coordinationNominate contacts for security, loading access, lift slots and any floor protection at both premises. Clarify which details the resident business must approve and which the moving team supplies.
Equipment and data responsibilityBack up data and agree who powers down, disconnects and reconnects devices. Identify servers, laboratory equipment, safes and machinery separately; general office packing does not establish specialist capability.
Handover and exceptionsUse the asset list to confirm what arrived and where it was placed. Record damage or missing items with photos and agree who is authorised to approve changes to the moving scope.

Office relocation cost estimates

Use your seat count for an initial budget, then list workstations, storage, equipment and records by department. The estimate needs to match the assets and work phases.

These bands overlap because a lightly furnished office and an equipment-heavy workspace need different work. Confirm the route, packing, dismantling, access, number of phases, applicable taxes and any specialist work in the final quote. Seat counts outside these examples need an individual assessment.

For a phased move, list what can leave first and what must stay until the last working session. An early furniture delivery can help prepare the destination, but it also creates a separate collection and receiving task. Agree each visit and its cost before scheduling staff around it.

Shiftify office moving base estimates
Office sizeEstimated base cost
Small: 5–10 seats₹8,000–₹40,000
Medium: 20–50 seats₹15,000–₹60,000+
Large: 50+ seats₹60,000–₹2,00,000+

Specify phases, access and responsibility in the quote

A clear office quote describes the asset list and the work schedule together. Comparing only the number of desks can leave important handling and coordination differences unexplained.

Before approving each phase, have the receiving coordinator confirm that its rooms, access and installation teams are ready. Agree who can postpone that phase if the destination is unavailable, and how already packed assets will be handled. Put any holding, repeat visit or rescheduling costs through the same approval contact as the original purchase order.

Office move decisions to record
DecisionWhat the written plan should say
Work phasesTeams or assets in each phase, collection slot and readiness required at the new office.
Furniture workWhich desks, partitions and storage units are assessed for dismantling and reassembly.
Building accessService entrances, lift bookings, permitted hours and any required protection.
Technical tasksWho disconnects, packs, receives, reconnects and tests each equipment category.
AuthorisationWho approves extra work, scope changes, payment and the final asset handover.
Company purchasingThe invoiced entity, purchase-order or vendor-onboarding requirements, and the authorised contact for each phase.

Make each team ready for collection

Prepare a short, shared moving brief with the labelling system, deadlines, contacts and tasks employees must complete. A consistent system is more useful than many separate instructions.

  • Label equipment and boxes with destination codes rather than relying on employee names alone. Keep an asset list available to the receiving coordinator.
  • Have your authorised IT team manage backups and shutdowns. Record accessories with their equipment and agree how devices are handed to the moving crew.
  • For any requested technical installation, name the equipment, task and responsible specialist in the accepted scope. Keep physical placement, reconnection and testing as separate sign-offs so the business knows what is ready to use.
  • Assign controlled handling for personnel files, contracts and other confidential records. Decide who packs, seals, carries and receives those materials.
  • Make the destination layout, utility readiness and access contacts available before dispatch. Leave time for your own teams to reconnect and test equipment before reopening.

Separate asset delivery from operational sign-off

Check delivered assets against the inventory and floor plan, then let the responsible internal teams verify that workspaces and systems are ready to use.

Record missing, damaged or misplaced items with their asset codes so follow-up is specific. Keep a list of agreed reassembly or placement work that remains open. A delivery signature and a working network are different milestones: use a separate reopening checklist for connectivity, equipment testing, staff access and business continuity. Retain the move records with your authorised coordinator.

Office Relocation — FAQ

What are the estimated costs for office relocation?
Use your seat count for an initial budget, then list workstations, storage, equipment and records by department. The estimate needs to match the assets and work phases. Small: 5–10 seats; Estimated base cost: ₹8,000–₹40,000 Medium: 20–50 seats; Estimated base cost: ₹15,000–₹60,000+ Large: 50+ seats; Estimated base cost: ₹60,000–₹2,00,000+ These bands overlap because a lightly furnished office and an equipment-heavy workspace need different work. Confirm the route, packing, dismantling, access, number of phases, applicable taxes and any specialist work in the final quote. Seat counts outside these examples need an individual assessment.
Can an office move be completed without downtime?
No move should be sold with an unqualified zero-downtime promise. Plan phases, backups and reopening priorities with your internal teams. Shiftify can assess the moving scope and available schedule, while technical continuity needs a separate plan and responsible owner.
Do you disconnect and reinstall computers or servers?
Do not assume technical work is included. Identify the equipment and ask which handling tasks can be accepted. Data backups, network setup, server migration and reconnection should be assigned to your IT team or a qualified provider unless expressly agreed otherwise.
Can you move an office on a weekend?
Request your preferred slot and share both buildings’ permitted hours. Crew, vehicle and building availability must be confirmed before treating the date as booked. State any noise, loading or security constraints during the survey.
ISO 9001:2015 Certified Company24+ years of legacy

Plan this move

Plan your office relocation with Shiftify

Review the scope, availability and payment terms in your written quote before booking.

Our own crews · Written scope before booking · 24/7 support