Furniture and large items
Check doorways, stairs and lift openings. Agree any dismantling, labelled fittings and reassembly.
Office moving with an agreed asset list, access schedule and responsibility for each stage.
Searching for “office shifting service near me”? Share the office locality, equipment inventory and permitted access hours at both buildings. For corporate relocation, agree workstation labels and collection timing, and coordinate IT disconnection and reconnection with your own team.
MATCH THE SERVICE TO THE MOVE
Use the service scope to prepare your enquiry. The final arrangement depends on your belongings and both addresses.
A CLEAR PLAN, STEP BY STEP
Know what to share, what to review and what to prepare.
Send both addresses, your inventory and preferred date. Include access details and items needing special care.
Compare packing, handling, transport, optional work, taxes and payment terms against the same requirements.
Confirm the available date, building permissions and receiving contact. Keep essentials and important documents with you.
Check the inventory with the crew, note visible concerns and keep the agreed handover and contact details.
CARE STARTS WITH PREPARATION
Discuss these details with the team so the packing and handling match the items being moved.
Check doorways, stairs and lift openings. Agree any dismantling, labelled fittings and reassembly.
Identify glassware, artwork and delicate pieces separately. Discuss the packing method before it is included in the scope.
Label assets by team and destination. Plan secure handling of records and arrange equipment disconnection with the responsible person.
Number cartons by room. Keep medicines, valuables, documents and first-day essentials accessible to you.
Understand the choices, prepare a useful enquiry and review the written scope for office relocation. Confirm availability for your locations, inventory and dates with Shiftify before booking.
An office relocation needs two linked plans: moving physical assets and making the business ready to operate. Assign an owner to each before fixing the sequence.
List workstations, seating, storage, equipment, records and shared spaces by team. Give every item a destination code that matches the receiving floor plan. Decide which assets can move early and which must remain available until the last working session. Use this priority list to discuss one move or separate phases.
The facilities contact, IT lead and business owner should agree the handoffs. Packing a computer does not complete a backup or reconnect a network. Identify technical work, confidential records, specialist equipment and disposal separately so there is a named responsible person for each task.
For a corporate relocation, distinguish the office asset move from employees’ personal house moves. Give each a separate inventory, receiving contact and approval route. If the company pays for an employee move, agree what it authorises and how any personally requested extras will be handled before booking.
For example, a label such as “Accounts / Floor 2 / Desk 14” can connect a monitor, sealed accessories box and chair to one receiving position. Use that same code on the inventory and floor plan. This is a planning example: replace it with your departments and destinations so the crew can place assets without opening every box.
Shiftify uses its own moving crews for the agreed relocation work. Use these points to define the service you need. The accepted tasks, materials and responsibilities should be reflected in your written quotation.
| Priority | Details to agree |
|---|---|
| An asset list and destination map | Group furniture and equipment by team, room or workstation. Use a destination label that stays with each item and keep the receiving floor plan available so delivery does not depend on one person remembering every desk. |
| Phases that reflect your work | Identify critical equipment and teams before selecting a date. Discuss a phased move if the business cannot close at once. Evening or weekend work is subject to building, crew and vehicle availability. |
| Building coordination | Nominate contacts for security, loading access, lift slots and any floor protection at both premises. Clarify which details the resident business must approve and which the moving team supplies. |
| Equipment and data responsibility | Back up data and agree who powers down, disconnects and reconnects devices. Identify servers, laboratory equipment, safes and machinery separately; general office packing does not establish specialist capability. |
| Handover and exceptions | Use the asset list to confirm what arrived and where it was placed. Record damage or missing items with photos and agree who is authorised to approve changes to the moving scope. |
Use your seat count for an initial budget, then list workstations, storage, equipment and records by department. The estimate needs to match the assets and work phases.
These bands overlap because a lightly furnished office and an equipment-heavy workspace need different work. Confirm the route, packing, dismantling, access, number of phases, applicable taxes and any specialist work in the final quote. Seat counts outside these examples need an individual assessment.
For a phased move, list what can leave first and what must stay until the last working session. An early furniture delivery can help prepare the destination, but it also creates a separate collection and receiving task. Agree each visit and its cost before scheduling staff around it.
| Office size | Estimated base cost |
|---|---|
| Small: 5–10 seats | ₹8,000–₹40,000 |
| Medium: 20–50 seats | ₹15,000–₹60,000+ |
| Large: 50+ seats | ₹60,000–₹2,00,000+ |
A clear office quote describes the asset list and the work schedule together. Comparing only the number of desks can leave important handling and coordination differences unexplained.
Before approving each phase, have the receiving coordinator confirm that its rooms, access and installation teams are ready. Agree who can postpone that phase if the destination is unavailable, and how already packed assets will be handled. Put any holding, repeat visit or rescheduling costs through the same approval contact as the original purchase order.
| Decision | What the written plan should say |
|---|---|
| Work phases | Teams or assets in each phase, collection slot and readiness required at the new office. |
| Furniture work | Which desks, partitions and storage units are assessed for dismantling and reassembly. |
| Building access | Service entrances, lift bookings, permitted hours and any required protection. |
| Technical tasks | Who disconnects, packs, receives, reconnects and tests each equipment category. |
| Authorisation | Who approves extra work, scope changes, payment and the final asset handover. |
| Company purchasing | The invoiced entity, purchase-order or vendor-onboarding requirements, and the authorised contact for each phase. |
Prepare a short, shared moving brief with the labelling system, deadlines, contacts and tasks employees must complete. A consistent system is more useful than many separate instructions.
Check delivered assets against the inventory and floor plan, then let the responsible internal teams verify that workspaces and systems are ready to use.
Record missing, damaged or misplaced items with their asset codes so follow-up is specific. Keep a list of agreed reassembly or placement work that remains open. A delivery signature and a working network are different milestones: use a separate reopening checklist for connectivity, equipment testing, staff access and business continuity. Retain the move records with your authorised coordinator.
AVAILABILITY
Choose a city for local moving guidance. Confirm availability for your addresses and preferred date with the team.
Organise an office move around work continuity, asset labels, secure records, building access and a tested restart plan with named responsibilities.
Build a room-by-room moving inventory, estimate cartons from your belongings, label boxes clearly and reconcile everything at pickup and delivery.
Prepare electronics and appliances with model-specific instructions, data backups, labelled accessories and a clear disconnection-to-installation plan.
Budget for a complete household move, compare written scopes and organise employer approvals, invoices and receipts without assuming reimbursement rules.
Compare moving quotes using the same inventory, packing, transport and access scope. Spot exclusions and clarify payment terms before booking.
Check the insurer, covered journey, exclusions, declared values, evidence and claims process before agreeing to transit cover for household or vehicle moving.
Review the scope, availability and payment terms in your written quote before booking.